Resource constrained scheduling of hierarchically structured design of activity networks

Document Type

Article

Peer Reviewed

1

Publication Date

1-1-1995

Journal/Book/Conference Title

IEEE Transactions on Engineering Management

Abstract

In this paper, a new approach to the problem of scheduling of design activities with precedence and multiple resource constraints is proposed. In addition to the AND type relationship, OR and EXCLUSIVE OR relationships may also exist between design activities. In order to handle these logical relationships, IDEF3 is used for network representation. A large network of design activities can be arranged in different levels of abstraction. A procedure is proposed to transform an IDEF3 model into a set of alternative precedence networks. In the networks selected, the activities that are resource independent are grouped with a partitioning procedure. In order to increase the efficiency of the search for the best schedule, a procedure based on Christofides et al. reduction procedure is introduced to determine a lower bound on the completion time of the hierarchically structured design activity network.

Keywords

Sustainability

Published Article/Book Citation

IEEE Transactions on Engineering Management, 42:2 (1995) pp.150-158.

This document is currently not available here.

Share

COinS
 

URL

http://ir.uiowa.edu/mie_pubs/175